A second bed is filled with topsoil (thanks to bstopsoil) with a third on the way. We have planted a second bed with a mixture vegetables and flowers, including sweetcorn and sunflowers which will provide screening as they grow. We now also have wood sourced from Stanford Hall which has been milled locally, and will provide us with the posts for the pergola which is the next phase of the project. This will be a good opportunity for patients who need to be assessed for work tolerance and hardening to engage in more physically demanding tasks.

Topsoil delivery.

Locally milled wood for the pergola.

3 layers of raised beds taking shape.

Work in progress.

Catch crops and sunflowers.